Enclosed please find a selection of publications of IL - Laabmayr & Partner Consulting Engineers.
» A9 Bosruck Tunnel - design approaches for swelling rock By Franz Lenz, Thomas Marcher and Thomas Neumayr In Geomechanics and Tunnelling 3/2010 [.pdf | 9 MB]
» 2DOC in Praxis. Part IV: The Tunnelling Project Harter Plateau / Linz By Gerald Fellinger and Christian Bergler In Felsbau magazin 5/6 / 2009 [.pdf | 2,8 MB]
» Harter Plateau Tramway - Tunnelling under the tracks of the Linz Main Station By Manfred Eder, Manfred Bauer and Friedrich Pühringer In Geomechanics and Tunnelling 5/2009 [.pdf | 7,54 MB]
» Tradenbergtunnel - The contractor in the role of client By Gerald Edlmair and Wolfgang Pacher In Geomechanics and Tunnelling 1/2009 [.pdf | 7,59 MB]
» Der Ganzsteintunnel 1971 bis 2008 - from preliminary design to completion By Michael Steiner, Horst Schweiger and Manfred Eder In Geomechanics and Tunnelling 1/2009 [.pdf | 9,03 MB]
» S6 Semmering Motorway, Ganzsteintunnel Upgrade of the Mürzzuschlag Bypass By Michael Steiner, Manfred Praxl, Horst Schweiger and Gerald Edlmair In Felsbau 2/2007 [.pdf | 1.2 MB]
» The Bosruck Tunnel, Bottleneck of the A9 Pyhrn Motorway - From the Feasibility Study of 2005 to the Anticipated Measures of Reconstruction By Robert Schnabl, Reinhold Czizsek and Thomas Neumayr In Felsbau 1/2007 [.pdf | 0.8 MB]
» The Kienbergwand Tunnel – An Extraordinary Solution for Pedestrians, Cyclists and Motor Vehicles By Roland Hittenberger, Friedrich Mittendorfer, Günther Maierhofer, Johann Keil, Johann Bauer, Manfred Eder and Reinhold Czizsek In Felsbau 1/2006 [.pdf | 3.91 MB]
» Bypass Grünburg – Tunnelling in Flysch with Low Overburden By Roman Plöderl and Thomas Neumayr In Felsbau 1/2006 [.pdf | 3.77 MB]
» Pipe-Jacking versus Conventional Tunnelling Confrontation of both methods at the Cable Tunnel System Graz Main Railway Station By Helmut Steiner, Gerald Edlmair and Ralf Vergeiner In Felsbau 6/2005 [.pdf | 3.15 MB]
» download Adobe Reader
|