Enclosed please find a selection of publications of IL - Laabmayr & Partner Consulting Engineers.
» The Kienbergwand Tunnel – An Extraordinary Solution for Pedestrians, Cyclists and Motor Vehicles By Roland Hittenberger, Friedrich Mittendorfer, Günther Maierhofer, Johann Keil, Johann Bauer, Manfred Eder und Reinhold Czizsek In Felsbau 1/2006 [.pdf | 3.91 MB]
» Bypass Grünburg – Tunnelling in Flysch with Low Overburden By Roman Plöderl und Thomas Neumayr In Felsbau 1/2006 [.pdf | 3.77 MB]
» Pipe-Jacking versus Conventional Tunnelling Confrontation of both methods at the Cable Tunnel System Graz Main Railway Station By Helmut Steiner, Gerald Edlmair and Ralf Vergeiner In Felsbau 6/2005 [.pdf | 3.15 MB]
» S6 Semmering Motorway, Ganzsteintunnel Upgrade of the Mürzzuschlag Bypass By Michael Steiner, Manfred Praxl, Horst Schweiger und Gerald Edlmair In Felsbau 2/2007 [.pdf | 1.2 MB]
» The Bosruck Tunnel, Bottleneck of the A9 Pyhrn Motorway - From the Feasibility Study of 2005 to the Anticipated Measures of Reconstruction By Robert Schnabl, Reinhold Czizsek and Thomas Neumayr In Felsbau 1/2007 [.pdf | 0.8 MB]
» download Adobe Reader
|
|