Ingenieurbüro Laabmayr & Partner ZT GmbH
IL Laabmayr GmbH | Back to Homepage
::CONSULTANCY SERVICES ::REFERENCES ::COMPANY PROFILE::DOWNLOADS
COMMUTER TRAFFIC HUB LINZ TRAM UNDERPASS FOR CENTRAL STATION
Within the scope of establishing the Linz Commuter Traffic Hub, the Linz Linien GmbH was responsible for building the Tram underpass at the Central Railway Station.

Thanks to this project, supra-regional and regional rail traffic are directly linked with the main public transport axis of the City of Linz and all local tram lines directly connected with the Central Station. At the same time, the Linz Central Station was rebuilt and a new Regional Service Centre set up beside of it.
(Image: Reinforcement Inner Shell)

S1 TRADENBERG TUNNEL
Cut and Cover, Tradenberg Tunnel CONSULTANCY
Overall project design. Alignment of the S1 West crosses the Tradenberg, a mountain ridge of the Bisamberg Range, with a tunnel (two tubes) of 2.423,5m resp. 2.456,6m length.

klick here for more details


(Image: Cut and Cover, Tradenberg Tunnel)